The Other 90%

JOURNAL

THE OTHER 90%

THE FINISHED HOME IS ONLY 10% OF THE WORK. EVERYTHING ELSE IS WHAT YOU’LL NEVER SEE.

The drawings are no longer on the table. The decisions have already been made. Contractors have left, furniture has arrived, and the work that brought the project together is no longer visible.

That is the nature of interior design and renovation. Much of the work happens before, behind and between the parts that eventually make it into the finished home.

Interior design isn’t simply about choosing finishes or producing drawings. It’s about managing the decisions, people and details that shape a home renovation from start to finish.

EVERY RENOVATION BEGINS BEFORE CONSTRUCTION

Before any contractor arrives on site, the project has already begun. The layout has been resolved, materials have been considered, lighting and electrical planning have been developed, and the renovation has been prepared for construction.

For newly completed properties, this may also include inspecting the home for defects and submitting them to the developer before renovation work begins. Renovation drawings may also need to be submitted to and approved by building management before work can start.

Paperwork rarely makes the project photos.

These aren’t separate services. They’re simply part of preparing a project that can actually be built.

EVERYTHING DEPENDS ON SOMETHING ELSE

A renovation isn’t one contractor working from start to finish.

It’s electricians, plumbers, ceiling installers, flooring specialists, carpenters, stone fabricators, painters, curtain suppliers, lighting suppliers, furniture companies and many others, each depending on someone else to finish first.

The ceiling can’t be closed until the electrical work is complete. Stone tops can’t be measured until the cabinetry has been installed. Curtains can’t be measured until the final ceiling height has been confirmed.

One delayed decision can quietly affect everything that comes after it.

Part of an interior designer’s role is making sure that sequence continues moving.

RENOVATIONS RARELY FOLLOW THE PLAN EXACTLY

A supplier discontinues a material. A site measurement differs from the drawings. An existing wall isn’t perfectly straight. A product arrives damaged. Sometimes homeowners change their minds halfway through the project.

Renovations rarely ask permission before changing the plan.

The project still has to move forward.

That means coordinating contractors, reviewing workmanship, answering technical questions, resolving issues on site and making decisions before small problems become larger ones.

Much of this happens without the homeowner ever seeing it.

That’s usually a good sign.

PROCUREMENT STARTS EARLIER THAN MOST PEOPLE EXPECT

Furniture isn’t ordered when the home is ready.

It’s ordered so the home can be.

Many pieces require weeks or months to manufacture. Some are imported. Others are custom made.

Ordering too early creates storage problems. Ordering too late can delay the project.

Procurement isn’t simply about buying furniture. It’s about making sure the right pieces are ordered, produced and delivered at the right stage of the renovation, so the project continues moving instead of waiting.

CONSTRUCTION ISN'T THE FINISH LINE

As construction comes to an end, the work continues.

Furniture is delivered. Lighting is installed. Accessories are placed. Final defects are checked. Contractors return to complete outstanding work. Homeowners are updated throughout the process until the home is ready to move into.

The finished home may feel effortless.

That’s usually the point.

The drawings record the decisions.

The finished home reveals them.

Everything else is the work.